An interrupted or abandoned assessment does not just delay things. It goes in a file. It becomes a line about conditions on site, and a line about conditions on site is a thing a contractor’s solicitor can do a great deal with eighteen months later.
I was standing at the crates with Master Chief Kettleman and a civilian project manager called Imara Vega, three hours into it, when I heard something behind me that did not belong on a working pier.
Heels. Moving fast, on concrete.
You learn what a pier sounds like. Boots, forklifts, the crane, the hydraulics, somebody shouting a number across sixty feet of water.
Heels is wrong in the way a bird inside a building is wrong. Everybody hears it and everybody turns.
By the time I had turned round, four people had already stopped what they were doing, which is why there were twenty witnesses and not two.